Barking Riverside - Area D

Client:Bellway Essex
Value: 2.3m
Commence: April 2013 - Dec 2013 with separate visit for external works
Duration: Programme completion December 2013. Separate visit for external works.
Architect: RMA Architects LLP
Engineer: Gravity Consulting Engineers Ltd

Construction of reinforced concrete frame to form new retail and residential accommodation. Works include bulk excavation; cast in situ piling; pile caps; ground beams; retaining walls; reinforced concrete slabs, walls, columns, stairs and cores; waterproofing to under croft parking and podium slab; substructure brickwork; beam and block floors complete with insulation and gas membrane; ground floor screeds; drainage; services; external works including footpaths, pavings and street furniture; provision of cranes

 