Barking 2.22.3 Phase Q

Client:Bellway Essex
Value: 4.82m
Commence: February 2013
Duration: Programme completion November 2013. Separate visit for external works.
Architect: RMA Architects LLP
Engineer: Gravity Consulting Engineers Ltd

Construction of reinforced concrete frame to form new residential accommodation and access road. Works include bulk excavation; cast in situ piling; pile caps; ground beams; retaining walls; reinforced concrete slabs, walls, stairs, columns and cores; waterproofing to under croft parking and podium slab; substructure brickwork; beam and block floors complete with insulation and gas membrane; ground floor screeds; drainage; services; reinforced earth embankments; gabion retaining walls; sub base, kerbs and tarmac to new road; external works including footpaths, pavings and street furniture; provision of all tower cranes

 